Description
REF: https://topcoder.atlassian.net/browse/PROD-3489
Issue 1
When creating a design 2 rounds challenge in Work Manager, the Submission phase shows BEFORE Checkpoint Submission, which is wrong as the Submission phase should be after Checkpoint Review.
When creating a 2 rounds challenge in Work Manager, the Submission phase should come after Checkpoint Review (as that is Round 2) and always comes after Round 1 which is Checkpoint Submission. Please see screenshot from Online Review below.
https://watch.screencastify.com/v/6XnNLiZXZZ5uQM3vVkWv
Issue 2
The Start Date should be editable for Checkpoint Submission too, similar to how we allow editing of the date for both registration and submission. Please ensure that all 3 values can be saved independently of each other.