Skip to content
This repository was archived by the owner on Mar 13, 2025. It is now read-only.
This repository was archived by the owner on Mar 13, 2025. It is now read-only.

Phase timelines during draft are not respected on activation #27

Open
@callmekatootie

Description

@callmekatootie
Collaborator

Steps:

  • Create Development + Challenge
  • Enter all details for the challenge
  • Ensure that Use Scheduling API is active for it
  • Save as draft
  • DO NOT activate the challenge. Go to OR and change the challenge timelines
  • Come back to the challenge in WM and activate it
  • Check OR again. The timelines are reset. Changes made earlier are lost

Activity

callmekatootie

callmekatootie commented on Feb 20, 2021

@callmekatootie
CollaboratorAuthor

I cannot reproduce this if I manually PATCH the challenge through POSTMAN.

Only through OR I face this issue

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

      Development

      No branches or pull requests

        Participants

        @callmekatootie

        Issue actions

          Phase timelines during draft are not respected on activation · Issue #27 · topcoder-archive/topcoder-platform-scheduler-api