This repository was archived by the owner on Mar 13, 2025. It is now read-only.
This repository was archived by the owner on Mar 13, 2025. It is now read-only.
Phase timelines during draft are not respected on activation #27
Open
Description
Steps:
- Create Development + Challenge
- Enter all details for the challenge
- Ensure that Use Scheduling API is active for it
- Save as draft
- DO NOT activate the challenge. Go to OR and change the challenge timelines
- Come back to the challenge in WM and activate it
- Check OR again. The timelines are reset. Changes made earlier are lost
Activity
callmekatootie commentedon Feb 20, 2021
I cannot reproduce this if I manually PATCH the challenge through POSTMAN.
Only through OR I face this issue