Skip to content

Cron Deploy

Cron Deploy #7189

Re-run triggered September 24, 2024 19:59
Status Cancelled
Total duration 4m 21s
Artifacts

cron.yml

on: schedule
Matrix: build-libs
Fit to window
Zoom out
Zoom in

Annotations

12 errors
Build with IDF release/v5.3 / Build for esp32c3 (release/v5.3)
The operation was canceled.
Build with IDF release/v5.3 / Build for esp32h2 (release/v5.3)
The operation was canceled.
Build with IDF release/v5.3 / Build for esp32s3 (release/v5.3)
The operation was canceled.
Build with IDF release/v5.3 / Build for esp32 (release/v5.3)
The operation was canceled.
Build with IDF release/v5.3 / Build for esp32c6 (release/v5.3)
The operation was canceled.
Build with IDF release/v5.3 / Build for esp32s2 (release/v5.3)
The operation was canceled.