Skip to content

Bump github.com/go-git/go-git/v5 from 5.15.0 to 5.16.0 #2361

Bump github.com/go-git/go-git/v5 from 5.15.0 to 5.16.0

Bump github.com/go-git/go-git/v5 from 5.15.0 to 5.16.0 #2361

Triggered via pull request April 16, 2025 05:05
Status Failure
Total duration 1m 16s
Artifacts

test-go-integration-task.yml

on: pull_request
run-determination
0s
run-determination
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (ubuntu-latest)
Process completed with exit code 1.
test (windows-latest)
The job was canceled because "ubuntu-latest" failed.
test (windows-latest)
The operation was canceled.
test (macos-latest)
The job was canceled because "ubuntu-latest" failed.
test (macos-latest)
The operation was canceled.