Bump github.com/go-git/go-git/v5 from 5.12.0 to 5.13.2 #2273
test-go-integration-task.yml
on: pull_request
run-determination
0s
Matrix: test
Annotations
5 errors
test (ubuntu-latest)
Process completed with exit code 201.
|
test (windows-latest)
The job was canceled because "ubuntu-latest" failed.
|
test (windows-latest)
The operation was canceled.
|
test (macos-latest)
The job was canceled because "ubuntu-latest" failed.
|
test (macos-latest)
The operation was canceled.
|