Steps to reproduce:

  • Create a new challenge
  • Work Type: Development
  • Work Format: Challenge
  • Proceed normally as any challenge creation and provide all the required details
  • Ensure that Scheduling API checkbox is checked before saving as draft
  • Also ensure that the start date and time is in the past
  • Save as Draft
  • Proceed to activate contest
  • Once activated, open OR - the timeline indicates that the phase was indeed started already in the past...

Expected:

  • If a start date and time combination is in the past, then the first phase of the challenge should start whenever the challenge is activated, and not in the past