You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Is your feature request related to a problem? Please describe
Manually go thru. the PVC test plans take about half a day, and it's too long for each release to manually test against all the PVC test plans.
Describe the behaviour you'd like
Trying to add more integration tests from the PVC test plans if possible, and make the manual PVC tests as small as possible.
Therefore, we could minimize the deployer only need to test the manually PVC test plans.
Uh oh!
There was an error while loading. Please reload this page.
Is your feature request related to a problem? Please describe
Manually go thru. the PVC test plans take about half a day, and it's too long for each release to manually test against all the PVC test plans.
Describe the behaviour you'd like
Trying to add more integration tests from the PVC test plans if possible, and make the manual PVC tests as small as possible.
Therefore, we could minimize the deployer only need to test the manually PVC test plans.
Describe alternatives you've considered
None
Definition of Done (DoD)
Additional context
#7901
The text was updated successfully, but these errors were encountered: