Skip to content

Latest commit

 

History

History
209 lines (150 loc) · 13.4 KB

BART_introduction.myst.md

File metadata and controls

209 lines (150 loc) · 13.4 KB
jupytext kernelspec
text_representation
extension format_name format_version
.md
myst
0.13
display_name language name
Python 3 (ipykernel)
python
python3

(BART_introduction)=

Bayesian Additive Regression Trees: Introduction

:::{post} Dec 21, 2021 :tags: BART, non-parametric, regression :category: intermediate, explanation :author: Osvaldo Martin :::

from pathlib import Path

import arviz as az
import matplotlib.pyplot as plt
import numpy as np
import pandas as pd
import pymc as pm
import pymc_bart as pmb

print(f"Running on PyMC v{pm.__version__}")
RANDOM_SEED = 5781
np.random.seed(RANDOM_SEED)
az.style.use("arviz-darkgrid")

BART overview

+++

Bayesian additive regression trees (BART) is a non-parametric regression approach. If we have some covariates $X$ and we want to use them to model $Y$, a BART model (omitting the priors) can be represented as:

$$Y = f(X) + \epsilon$$

where we use a sum of $m$ regression trees to model $f$, and $\epsilon$ is some noise. In the most typical examples $\epsilon$ is normally distributed, $\mathcal{N}(0, \sigma)$. So we can also write:

$$Y \sim \mathcal{N}(\mu=BART(X), \sigma)$$

In principle nothing restricts us to use a sum of trees to model other relationship. For example we may have:

$$Y \sim \text{Poisson}(\mu=BART(X))$$

One of the reason BART is Bayesian is the use of priors over the regression trees. The priors are defined in such a way that they favor shallow trees with leaf values close to zero. A key idea is that a single BART-tree is not very good at fitting the data but when we sum many of these trees we get a good and flexible approximation.

+++

Coal mining with BART

To better understand BART in practice we are going to use the oldie but goldie coal mining disaster dataset. One of the classic examples in PyMC. Instead of thinking this problem as a switch-point model with two Poisson distribution, as in the original PyMC example. We are going to think this problem as a non-parametric regression with a Poisson response (this is usually discussed in terms of Poisson processes or Cox processes, but we are OK without going into those technicalities). For a similar example but with Gaussian processes see 1 or 2. Because our data is just a single column with dates, we need to do some pre-processing. We are going to discretize the data, just as if we were building a histogram. We are going to use the centers of the bins as the variable $X$ and the counts per bin as the variable $Y$

try:
    coal = np.loadtxt(Path("..", "data", "coal.csv"))
except FileNotFoundError:
    coal = np.loadtxt(pm.get_data("coal.csv"))
# discretize data
years = int(coal.max() - coal.min())
bins = years // 4
hist, x_edges = np.histogram(coal, bins=bins)
# compute the location of the centers of the discretized data
x_centers = x_edges[:-1] + (x_edges[1] - x_edges[0]) / 2
# xdata needs to be 2D for BART
x_data = x_centers[:, None]
# express data as the rate number of disaster per year
y_data = hist / 4

In PyMC a BART variable can be defined very similar to other random variables. One important difference is that we have to pass ours Xs and Ys to the BART variable. Here we are also making explicit that we are going to use a sum over 20 trees (m=20). Low number of trees like 20 could be good enough for simple models like this and could also work very good as a quick approximation for more complex models in particular during the iterative or explorative phase of modeling. In those cases once we have more certainty about the model we really like we can improve the approximation by increasing m, in the literature is common to find reports of good results with numbers like 50, 100 or 200.

with pm.Model() as model_coal:
    μ_ = pmb.BART("μ_", X=x_data, Y=y_data, m=20)
    μ = pm.Deterministic("μ", np.abs(μ_))
    y_pred = pm.Poisson("y_pred", mu=μ, observed=y_data)
    idata_coal = pm.sample(random_seed=RANDOM_SEED)

The white line in the following plot shows the median rate of accidents. The darker orange band represent the HDI 50% and the lighter one the 94%. We can see a rapid decrease of coal accidents between 1880 and 1900. Feel free to compare these results with those in the original {ref}pymc:pymc_overview example.

_, ax = plt.subplots(figsize=(10, 6))

rates = idata_coal.posterior["μ"]
rate_mean = idata_coal.posterior["μ"].mean(dim=["draw", "chain"])
ax.plot(x_centers, rate_mean, "w", lw=3)
az.plot_hdi(x_centers, rates, smooth=False)
az.plot_hdi(x_centers, rates, hdi_prob=0.5, smooth=False, plot_kwargs={"alpha": 0})
ax.plot(coal, np.zeros_like(coal) - 0.5, "k|")
ax.set_xlabel("years")
ax.set_ylabel("rate");

In the previous plot the white line is the median over 4000 posterior draws, and each one of those posterior draws is a sum over m=20 trees.

The following figure shows two samples from the posterior of $\mu$. We can see that these functions are not smooth. This is fine and is a direct consequence of using regression trees. Trees can be seen as a way to represent stepwise functions, and a sum of stepwise functions is just another stepwise function. Thus, when using BART we just need to know that we are assuming that a stepwise function is a good enough approximation for our problem. In practice this is often the case because we sum over many trees, usually values like 50, 100 or 200. Additionally, we often average over the posterior distribution. All this makes the "steps smoother", even when we never really have an smooth function as for example with Gaussian processes (splines). A nice theoretical result, tells us that in the limit of $m \to \infty$ the BART prior converges to a nowheredifferentiable Gaussian process.

The following figure shows two samples of $\mu$ from the posterior.

plt.step(x_data, idata_coal.posterior["μ"].sel(chain=0, draw=[3, 10]).T);

The next figure shows 3 trees. As we can see these are very simple function and definitely not very good approximators by themselves. Inspecting individuals trees is generally not necessary when working with BART, we are showing them just so we can gain further intuition on the inner workins of BART.

bart_trees = μ_.owner.op.all_trees
for i in [0, 1, 2]:
    plt.step(x_data[:, 0], [bart_trees[0][i].predict(x) for x in x_data])

Biking with BART

+++

To explore other features offered by BART in PyMC. We are now going to move on to a different example. In this example we have data about the number of bikes rental in a city, and we have chosen four covariates; the hour of the day, the temperature, the humidity and whether is a workingday or a weekend. This dataset is a subset of the bike_sharing_dataset.

try:
    bikes = pd.read_csv(Path("..", "data", "bikes.csv"))
except FileNotFoundError:
    bikes = pd.read_csv(pm.get_data("bikes.csv"))

X = bikes[["hour", "temperature", "humidity", "workingday"]]
Y = bikes["count"]
with pm.Model() as model_bikes:
    α = pm.Exponential("α", 1 / 10)
    μ = pmb.BART("μ", X, Y)
    y = pm.NegativeBinomial("y", mu=np.abs(μ), alpha=α, observed=Y)
    idata_bikes = pm.sample(random_seed=RANDOM_SEED)

Partial dependence plots

+++

To help us interpret the results of our model we are going to use partial dependence plot. This is a type of plot that shows the marginal effect that one covariate has on the predicted variable. That is, what is the effect that a covariate $X_i$ has of $Y$ while we average over all the other covariates ($X_j, \forall j \not = i$). This type of plot are not exclusive of BART. But they are often used in the BART literature. PyMC-BART provides an utility function to make this plot from the inference data.

pmb.plot_dependence(μ, X=X, Y=Y, grid=(2, 2), var_discrete=[3]);

From this plot we can see the main effect of each covariate on the predicted value. This is very useful we can recover complex relationship beyond monotonic increasing or decreasing effects. For example for the hour covariate we can see two peaks around 8 and and 17 hs and a minimum at midnight.

When interpreting partial dependence plots we should be careful about the assumptions in this plot. First we are assuming variables are independent. For example when computing the effect of hour we have to marginalize the effect of temperature and this means that to compute the partial dependence value at hour=0 we are including all observed values of temperature, and this may include temperatures that are actually not observed at midnight, given that lower temperatures are more likely than higher ones. We are seeing only averages, so if for a covariate half the values are positively associated with predicted variable and the other half negatively associated. The partial dependence plot will be flat as their contributions will cancel each other out. This is a problem that can be solved by using individual conditional expectation plots pmb.plot_dependence(..., kind="ice"). Notice that all this assumptions are assumptions of the partial dependence plot, not of our model! In fact BART can easily accommodate interaction of variables Although the prior in BART regularizes high order interactions). For more on interpreting Machine Learning model you could check the "Interpretable Machine Learning" book {cite:p}molnar2019.

Finally like with other regression methods we should be careful that the effects we are seeing on individual variables are conditional on the inclusion of the other variables. So for example, while humidity seems to be mostly flat, meaning that this covariate has an small effect of the number of used bikes. This could be the case because humidity and temperature are correlated to some extend and once we include temperature in our model humidity does not provide too much extra information. Try for example fitting the model again but this time with humidity as the single covariate and then fitting the model again with hour as a single covariate. You should see that the result for this single-variate models will very similar to the previous figure for the hour covariate, but less similar for the humidity covariate.

+++

Variable importance

As we saw in the previous section a partial dependence plot can visualize give us an idea of how much each covariable contributes to the predicted outcome. But BART itself leads to a simple heuristic to estimate variable importance. That is simple count how many times a variable is included in all the regression trees. The intuition is that if a variable is important they it should appears more often in the fitted trees that less important variables. While this heuristic seems to provide reasonable results in practice, there is not too much theory justifying this procedure, at least not yet.

The following plot shows the relative importance in a scale from 0 to 1 (less to more importance) and the sum of the individual importance is 1. See that, at least in this case, the relative importance qualitative agrees with the partial dependence plot.

Additionally, PyMC-BART provides a novel method to assess the variable importance. You can see an example in the bottom panel. On the x-axis we have the number of covariables and on the y-axis the square of the Pearson correlation coefficient between the predictions made for the full-model (all variables included) and the restricted-models, those with only a subset of the variables. The components are included following the relative variable importance order, as show in the top panel. Thus, in this example 1 component means hour, two components means hour and temperature, 3 components hour, temperatureand humidity. Finally, four components means hour, temperature, humidity, workingday, i.e., the full model. Hence, from the next figure we can see that even a model with a single component, hour, is very close to the full model. Even more, the model with two components hour, and temperature is on average indistinguishable from the full model. The error bars represent the 94 % HDI from the posterior predictive distribution. It is important to notice that to compute these correlations we do not resample the models, instead the predictions of the restricted-models are approximated by prunning variables from the full-model.

pmb.plot_variable_importance(idata_bikes, μ, X, samples=100);

Authors

  • Authored by Osvaldo Martin in Dec, 2021 (pymc-examples#259)
  • Updated by Osvaldo Martin in May, 2022 (pymc-examples#323)
  • Updated by Osvaldo Martin in Sep, 2022
  • Updated by Osvaldo Martin in Nov, 2022

+++

References

:::{bibliography} :filter: docname in docnames

martin2021bayesian quiroga2022bart :::

+++

Watermark

%load_ext watermark
%watermark -n -u -v -iv -w

:::{include} ../page_footer.md :::